Projects - Archive 2007
Camp Pedricktown - Phases I-III

The board of Energy Freedom Pioneers has a vision for the property known as Camp Pedricktown - Block 45, Lot 5. This industrial site is ideally situated close to key North-South and East-West truck routes, as well as the Delaware River shipping channel and key customers and suppliers on the East Coast.

The mission is to renovate, manage and operate a high tech industrial park located minutes from major highways, waterways, railways, refineries, power generation stations and freight terminals including export terminals, that is occupied by thriving alternative energy manufacturers that mass produce affordable energy products. Specific objectives include:

PROJECT IMPROVEMENTS AND PHASING

The Project shall consist of the refurbishment of existing structures and the construction of manufacturing, office commercial and flex industrial uses. The refurbishment of the vacant existing structures and infrastructures will be accomplished in Phase I. The refurbishment of the leased existing structures and infrastructures will be accomplished in Phase II. The new construction of manufacturing, commercial and flex industrial uses will be accomplished in Phase III.


Phase I
- Refurbishment of Nine Unoccupied Buildings and Waste Water Treatment Plant

There are currently nine unoccupied and un-leased structures that require refurbishment. In addition, the Wastewater Treatment Plant is in need of considerable refurbishment to bring it up to permit compliance. These buildings are in various stages of disrepair and require extensive repairs and investment to bring them up to a level where they could meet local building codes, be granted Certificates of Occupancy and be leased to prospective tenants. Concurrent with these building upgrades will be a general cleaning and refurbishment of the roads, lawns, sidewalks and general infrastructure of the property. The plan for Phase I Refurbishment is as follows:

Order Description Lot Number Project Description Square Feet Current Condition
1
Waste Treatment Plant
Rebuild/Refurbish
Poor
2
Building
440
Tear Down/Rebuild
5,120
Poor
3
Building
351
Build to Suit
8,384
Poor
4
Building
370
Build to Suit
8,384
Poor
5
Building
422
Warehouse Remodel
4,524
Poor
6
Complex
432
Multiplex/Lab Capable
34,587
Poor
7
Pad
315
No Building
10,000
N/A
8
Dwelling
179
Single Family
1,100
Poor
9
Dwelling
177
Twinplex/Apartment
1,768
Poor
10
Building
322
Office Storage
4,800
Good

 


Phase 1


Phase II - Refurbishment of Eight Occupied Buildings

There are currently eight occupied and leased structures that require minor refurbishment and upgrades, primarily to the exterior of the buildings to create a uniform appearance. These buildings are in various stages of disrepair and will be remodeled to ensure that all buildings within the complex have a common façade and exterior. These buildings are shown in blue below:

Phase 2

 

Phase III - New Development and Construction

There are approximately 30 acres of property that have no existing structures and that are suitable for development and new construction. The total plan for this phase of the property improvement has not yet been fully developed. The portions of the property that have been identified for new development and construction during Phase III are indicated on the map below in orange and are as follows:

Phase 3